Windmill blade and hub at Kandla port |
The
windmill hubs and windmill blades which we had loaded at Tuticorin, have been
successfully discharged at Kandla. This consignment had come from China and was
waiting to be transported to port of Gujrat. Background in the photos speaks
clearly of the filth,
Discharged windmill blades in the background |
chaos and mismanagement. We had a chance to go ashore. I had decided to go to Gandhidham Gurudwara with my family. Other than enjoying keertan (ਕੀਰਤਨ) and langar (ਲੰਗਰ) there is nothing worthy of mention. The roads are littered with potholes and loose dirt. There was dust all around & suspended
in the air. The worst part was the initial about a kilometer of ride from
Kandla port. It was stinking beyond belief. Though the car was non A.C. and it
was hot, we were forced to keep the window glasses shut. The stench was simply
unbearable.
Now
we have arrived at Mormugao on 28th April late morning. We are drifting waiting to be moored to Dolphin. Vessel will be loading iron ore pellets through
barges coming alongside. Vessel’s cranes will be used. After completion
loading we will be headed to N.Mangalore for loading Suzlon’s windmill blades
over hatch tops.
Windmill hub being positioned on truck |
Iron
ore pellets will remain untouched at Karnatka and we will steam northward with
blades above and ore underneath to
Kandla again.
No comments:
Post a Comment